
WINTER SERVICES
WINTERIZING SERVICES
-
1 - 4 Cylinder Engine..................$270.00 Plus Parts
6 - 8 Cylinder Engine….............$300.00 Plus Parts
Includes: Stabilize fuel tanks, lines, carbs or injectors, flush block/heat exchangers, manifolds, drain down all raw water, run on propylene glycol based non-toxic anti-freeze through raw water cooling passages, test all season antifreeze, fog cylinders, corrosion guard all electrical.
-
Merc. Alpha I, Gen II, OMC.....$310.00 Plus Parts
Bravo I, Bravo II........................$335.00 Plus Parts
Bravo III, King Cobra................$375.00 Plus Parts
Includes: Remove outdrive, check alignment, grease
u-joints, input shaft, gimbal bearing, inspect bellows
& hoses, change gear oil (synthetic), grease prop shaft & fittings and mount drive back on with new gasket & O-ring.
Note: I.M.S. will not be responsible if intermediate cable stiffens up over winter months.
-
2 H.P. to 25 H.P....................$150.00 Plus Parts
to 100 H.P...........................$195.00 Plus Parts
to 225 H.P............................$235.00 Plus Parts
DFI & EFI………....................$275.00 Plus Parts
Includes: Stabilize fuel tanks, fuel lines, carbs or injectors, flush power head with propylene glycol based non-toxic antifreeze (DFI & EFI Only), fog cylinders, change gear oil (synthetic), grease prop shaft & all fittings and corrosion guard all electrical.
-
2 H.P. to 8 H.P................$150.00 Plus Parts
9.9 H.P. to 25 H.P….…....$165.00 Plus Parts
30 H.P. to 60 H.P............$220.00 Plus Parts
70 H.P to 130 H.P............$300.00 Plus Parts
140 H.P. & up...................$330.00 Plus Parts
V8 Verado.........................$395.00 Plus Parts
V10 Verado.........................$425.00 Plus Parts
V112 Verado.........................$455.00 Plus Parts
Includes: Stabilize fuel tanks, fuel lines, carbs or injectors, flush power head with propylene glycol based non-toxic antifreeze, fog cylinders, change engine oil & filter, change gear oil (synthetic), grease prop shaft & fitting and corrosion guard electrical.
-
2 - 4 Cylinder Engine..................$290.00 Plus Parts
6 - 8 Cylinder Engine……............$385.00 Plus Parts
Includes: Fuel treatment, run engine up in temp., flush out all raw water passages, drain & add propylene glycol based non-toxic antifreeze to raw water cooling systems, test engine coolant system for correct P.H. levels & freezing point properties and corrosion guard all electrical.
-
OIL CHANGES
Gas & Diesel............. Time plus Materials
Minimum one hour labor per engine
FRESH & SALT WATER SYSTEMS AC UNITS / BILGES / HEADS
Hourly Rate Plus Materials
WINTER STORAGE
NOVEMBER 1ST-APRIL 30TH
-
Call For Availability-Deposit Required
$14.00 Per Square Foot (Length X Width)
Swim platforms, engines, pulpits & trailer tongues apply.
Includes: Hauling, blocks, stands and relaunch plus additional moves into & out of storage building
-
Call For Availability-Deposit Required
$12.00 Per Square Foot (Length X Width)
Swim platforms, engines, pulpits & trailer tongues apply.
Includes: Hauling, blocks, stands and relaunch
-
Up to 30'…….$55.00 Per Foot
31' & over…...$60.00 Per Foot
Includes: Hauling, blocks, stands and relaunch
-
Working tongue jacks required
All Sizes $47.00 Per Foot
Includes: Hauling within 5 miles of IMS, additional charges may apply outside of that range
-
Up to 25 H.P…………$135.00
Does not include winterizing
-
(Includes labor for removal and periodic charging)
Up to 31 Series…………….$75.00 Per Battery
Not responsible if battery does not hold a charge
SHRINK WRAP
Includes frame and material
Up to 21'................................…......$25.00 Per Foot
22' to 30'........................................$28.00 Per Foot
31' to 40'... ....................................$32.00 Per Foot
41' to 50’…………...........……...........$36.00 Per Foot
51’ and Over……………………………....Call For Pricing
Doors.............................................$70.00 Each
Boats in Water................………......Additional $280.00
Note: Additional labor will be added for removal of any canvas or accessories. IMS is not responsible for any dry-rotted canvas/cushion/curtain failure or acts of nature.
Due to cost uncertainties from our suppliers, shrink wrap pricing is not guaranteed and subject to change without notice.
LABOR RATES
-
Per Hour.................................................$165.00
Minimum..................................................$85.00
*Overtime- after 4:30pm………… ………...$247.50
*Weekends (4 Hour Minimum)……………$247.50
*Estimates- credited towards work…...........$200.00
-
Mobile Labor Rate……….$195.00......(1 Hr Minimum)
*Overtime- after 4:30pm………............……...$295.00
*Weekends (4 Hour Minimum)…......…………$295.00
*Estimates- credited towards work…............$200.00
*Mobilization......(Over 10 miles from shop)....$150.00
Hourly Rate from Island Marine to Job Site & Back.
Add 20% and Mobilization Fee (if applicable) to all
Flat Rates for Mobile Service
EQUIPMENT RATES
100 Ton Railway.……..$35.00 per ft
(Railway pricing includes 10 days, water & electricity)
Crane Charge......$200.00 per hour plus labor
(2 Person Minimum – Minimum 1 Hour Each Person)
Work Boat (Flat Fee) $200.00 plus labor (1 hr. min)
-
Includes transport from Badgers Island Marina to Island Marine Service
Includes blocks and stands
$15.00 per ft. X L.O.A. (Each way)
Contact us for price quote for transport from other locations
-
Haul/ Relaunch on customer trailer
Flat Fee of $165.00 each way
-
Boat left on Island Marine Service trailer
Up to 30’…$17.00 Per Foot X L.O.A.
31’ to 45’…$17.00 Per Foot X L.O.A.